New-generation logistics platform specifically for hazardous materials
Compliant with SEVESO III standards :
site subject to authorisation
- 4000m2 covered, frost-free building with 3-hour fire-rated walls,
- 800m2 reception and preparation area with loading docks,
- Computerised stock management system and WMS.
- Automated sprinkler system (building + racks),
- Remote retention systems,
- Wheel locks on our loading docks.
- 3,000 pallet spaces
- Dedicated units
- Staff awareness training